These levels and the foundation levels of the piers have been established in the meantime. Hydraulic research into the length of the protective bottom-revetment The hollows caused by scouring at the downstream side of the storm-surge barrier should not exceed a depth of 25 m, and the occurence of spontaneous liquefaction should be avoided. The measures to be taken will be determined by model research. The hydraulic properties of the storm-surge barrier will be fed into models with a smaller scale, via a so called schemetical research, whereby accurate tests are made to find out which form the storm-surge barrier must have in the model to come to the same discharge-coefficient as in the design. Model research and computer calculations combined can determine the requisite length of the protective bottom-revetment in order to remain within the acceptable limits of scouring, even after 10 years. Research into the filter-system for the design of the base At the design of the base for the storm-surge barrier there was great concern about the stability of the interface between the bottom material and the lowest layer of the foundationbed. Due to the wave action heavy cyclical surface energy gradients were exerted at these places. Little is known about the behaviour of filters under cyclical loads; it was deemed necessary therefore to undertake elementary research into these loads in three test cases, in combination, if so required, with surface energy gradients running in other directions. The best solution of the problem at hand proved to be 'the two layer solution': between the bottom and the first layer of the foundationbed an extra layer of coarse rubble is added consisting of a graded mixture of loose stones with a diameter of between 0.3 and 32 mm. This will ensure both the stability and the filter action. Report of studies and preparations related to the storm-surge barrier, first semester of 1978 In so far as they have not been discussed in separate reports, some changes in the details of the design of the storm-surge barrier which have been introduced in the first semester of 1978, are mentioned in this publication. It appeared possible to reduce the assumed t >tal perpendicular wave-load by 20%. In view oft ie discharge-coefficient and the necessary reserves the gross wet cross-section has bee fixed at 18.000 m2. The retaining height was increased up to N.A.P. 5.8 m. The piers will bf positioned, directly and without correction afterwards, on the flat foundationbed. It isthi s possible to decrease the magnitude of the soil-compaction. The design of the compaction vessel shortly to be built can be adjusted accordingly. Tests with the second gate of the storm-sur< a barrier in the Hollandse IJssel The oldest Delta-construction, the movable storm-surge barrier in the Hollandse IJssel, t e building of which started in 1954 already, wa not equipped with a second gate until 1976.1 his second gate will become operational in the r aar future. Preceding this event a number of test have been made to determine the properties af the new gate and to observe at the same tirrv the behaviour of the barrier during opening i nd closing procedures at the time of tidal flow a d at a difference in water-level across the barri r. These manoeuvres prove to be possible with act adverse effects for the hydraulic structure or ts surroundings. Re-adjustment works in the southern Delta area As a result of the hydraulic constructions in t ie Delta area the system of water-control in the western part of the Netherlands will have to )e re-adjusted: everywhere water-levels are ch n- ging. As the original plans related to the Oos er- schelde have been changed, the surroundint territories must also be re-adjusted. Especia y when the storm-surge barrier is closed, sue! high water-levels may occur on the Ooster- schelde, that none of the six surrounding pu n- ping stations is capable, with their present c. pa- city, of handling the discharges adequately, le- adjustment, however, can be completed in t ne. 324

Tijdschriftenbank Zeeland

Driemaandelijks bericht Deltawerken | 1978 | | pagina 50